Flexible Manufacturing Systems

Regular price €117.99
Quantity:
In stock with our UK publisher. 14-28 days
Delivery/Collection within 10-20 working days
14 days return policy Shipping & Delivery
A01=Zubair M. Mohamed
Author_Zubair M. Mohamed
Automated Material Handling System
Capacity Flexibility
capacity planning
Category=KCD
Category=KCF
Category=KCL
Category=KCM
Category=KCP
Data Sets
Due Date Performance
eq_bestseller
eq_business-finance-law
eq_isMigrated=1
eq_isMigrated=2
eq_nobargain
eq_non-fiction
Flexibility Measures
flexible manufacturing systems
flexible system performance analysis
FMS
FMS Configuration
FMS Loading
FMS Loading Problem
FMS Operating
FMS System
Higher System Utilization
inventory control
Loading Policies
Machine Flexibility
manufacturing optimisation
Maximizing Production Rate
Minimum Cost Policy
operating policies
operational research
Paired Difference Test
Part Routing
Part Types
production planning
production scheduling
routing algorithms
Routing Flexibility
Routing Problem
Symmetric Unimodal Distribution
Tool Magazine
Tool Magazine Capacity
Typical FMS

Product details

  • ISBN 9781138314733
  • Weight: 520g
  • Dimensions: 156 x 234mm
  • Publication Date: 26 Jul 2018
  • Publisher: Taylor & Francis Ltd
  • Publication City/Country: GB
  • Product Form: Hardback
Secure checkout Fast Shipping Easy returns

Originally published in 1994 this book undertakes a comprehensive study dealing with the effects of machine flexibility, tool magazine capacity, varying production demands and different oeprating policies on the production planning problems. Performance measures such as FMS flexibility, makespan and inventory are used in evaluating the effects. Three measures of FMS flexibility - actual routing flexibility, potential routing flexibility and capacity flexibility are defined and operationalized.

Dr. Mohamed was born in Bangalore, India and did his undergraduate education in Mechanical Engineering from B.M.S. College of Engineering, Bangalore, India in 1979. Just before graduation he was hired by Widia (India) Ltd. as Technical Engineer and worked for them till December 1983.

More from this author