Home
»
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
Regular price
€124.99
603 verified reviews
100% verified
In stock with our UK publisher. 14-28 days
Delivery/Collection within 10-20 working days
Shipping & Delivery
Our Delivery Time Frames Explained
2-4 Working Days: Available in-stock
14-28 Working Days: On Backorder
Will Deliver When Available: On Pre-Order or Reprinting
We ship your order once all items have arrived at our warehouse and are processed. Need those 2-4 day shipping items sooner? Just place a separate order for them!
Close
A01=L. K. Lampe
Author_L. K. Lampe
Category=PDG
eq_bestseller
eq_isMigrated=1
eq_nobargain
eq_non-fiction
eq_science
MONITORING BMPS SUDS
Product details
- ISBN 9781843397168
- Dimensions: 156 x 234mm
- Publication Date: 30 Jun 2004
- Publisher: IWA Publishing
- Publication City/Country: GB
- Product Form: Paperback
Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their "asset base". Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance. Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the US and UK to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs.
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
€124.99
