Quick Response Manufacturing

Regular price €80.99
Quantity:
In stock with our UK publisher. 14-28 days
Delivery/Collection within 10-20 working days
14 days return policy Shipping & Delivery
A01=Rajan Suri
Author_Rajan Suri
Average Lead Time
Beloit Corporation
Category=KJMV5
Cell Team
Cellular Manufacturing
Cycle Time
EOQ
eq_bestseller
eq_business-finance-law
eq_isMigrated=1
eq_isMigrated=2
eq_nobargain
eq_non-fiction
High WIP
JIT
JIT Manufacturing
Lead Time Impact
Lead Time Reduction
Lead Times
Lot Size
Lot Size Reduction
Lot Sizing Policies
Low WIP
MRP System
Office Operations
operations management
organizational change management
Planned Lead Times
POLCA control system
process improvement strategies
production system design
QRM
Quick Response Manufacturing
rapid product introduction techniques
Setup Reduction
Short Lead Times
Speed-based competition
System Dynamics Principles
Time-based competition strategies
time-based manufacturing
Transfer Batches

Product details

  • ISBN 9781563272011
  • Weight: 1230g
  • Dimensions: 152 x 229mm
  • Publication Date: 22 Jun 1998
  • Publisher: Taylor & Francis Inc
  • Publication City/Country: US
  • Product Form: Hardback
Secure checkout Fast Shipping Easy returns
Developed by the author and now being employed by a number of businesses, Quick Response Manufacturing (QRM) is an expansion of time-based competition, aimed at a single target with the goal of reducing lead times. The key difference between QRM and other time-based programs is that QRM covers an entire organization, from the shop floor to the office, to sales and beyond. Providing guidelines for establishing a QRM enterprise, this volume builds upon kaizen, TQM, TPM, and other practice to help organizations streamline all functions of their operation. It shows how to quickly introduce products, along with ways to rethink materials and production management.
Rajan Suri (Founding Director, Center for Quick Response Manufacturing, Madison, Wisconsin, USA) (Author)

More from this author