USS Saratoga (CV-3): From the 1920s30s and WWII Combat to Operation Crossroads | Agenda Bookshop Skip to content
Online orders placed from 19/12 onward will not arrive in time for Christmas.
Online orders placed from 19/12 onward will not arrive in time for Christmas.
A01=David Doyle
Age Group_Uncategorized
Age Group_Uncategorized
Author_David Doyle
automatic-update
Category1=Non-Fiction
Category=JWMV2
COP=United States
Delivery_Delivery within 10-20 working days
Language_English
PA=In stock
Price_€20 to €50
PS=Active
softlaunch

USS Saratoga (CV-3): From the 1920s30s and WWII Combat to Operation Crossroads

English

By (author): David Doyle

USS Saratoga and her sister ship USS Lexington were the two largest aircraft carriers in the world until 1944. The keel of the battle cruiser USS Saratoga (CC-3) was laid by New York Shipbuilding in Camden, New Jersey, on September 25, 1920. Work on the fast, formidably armed battle cruiser was suspended in February 1922, when the Washington Naval Conference negotiated limits on warship sizes and numbers.  Once the accord was signed, the decision was made to covert the 28 percent complete Saratoga into an aircraft carrier (the same fate befell her sister ship, Lexington). Launched as an aircraft carrier on April 7, 1925, she became the largest ship of that type afloat. Saratogas revolutionary turboelectric drive and hull design allowed her to operate at 33 knots (either forward or backward), a trait believed to be useful in the event of combat damage to either end of her flight deck. And damaged she was. Though in port at San Diego, California, when the Japanese attacked Pearl Harbor, during the ensuing war the ship was damaged repeatedly, and sometimes severely. Despite this, she fought throughout the war, earning eight battle stars. Following the war, in view of her age, past damage, and the limitations of her design, Saratoga was deemed surplus and was expended as a target during the Bikini Atoll nuclear tests. She survived the first Able bomb test but was sunk by the Baker test on July 25, 1946. This 144-page volume, an expansion of the authors earlier work, immerses the reader in the construction and operation of the ship at peace and war, as well as detailing the many refits and repairs she underwent, through over 350 photos and illustrations. See more
Current price €25.65
Original price €28.50
Save 10%
A01=David DoyleAge Group_UncategorizedAuthor_David Doyleautomatic-updateCategory1=Non-FictionCategory=JWMV2COP=United StatesDelivery_Delivery within 10-20 working daysLanguage_EnglishPA=In stockPrice_€20 to €50PS=Activesoftlaunch
Delivery/Collection within 10-20 working days
Product Details
  • Weight: 522g
  • Dimensions: 229 x 229mm
  • Publication Date: 13 Dec 2022
  • Publisher: Schiffer Publishing Ltd
  • Publication City/Country: United States
  • Language: English
  • ISBN13: 9780764364662

About David Doyle

Since 1999 David Doyle has written over 200 published books and the range of topics has expanded to include warships and combat aircraft. These books have ranged in size from 56 pages to large works approaching 1000 pages.

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
We use cookies to ensure that we give you the best experience on our website. If you continue we'll assume that you are understand this. Learn more
Accept